Sunday 22 December 2013

WEEK 12

WEEK 12 ( FINAL PROJECT VIEW )

Figure 1 :







Figure 2 :




AIM
  • To make an assemble and finish up the project design (hardware).
  • To finalize a project coding by compile the entire of programming.


RESULTS
  • At the figure 1 shows that the full view of the project look like. The connection of the project is correctly done when testing process have been make. 
  • At the figure 2, show some coding to develop this prototype. The full coding for this project is use around 400 line with 8 parking slots. 

PLAN FOR THE NEXT WEEK
  • To design a poster for FYP presentation.
 